Pre-feasibility, Project Allocation & Bidding Assistance

  • • Identification of viableDistrict
  • • Site Visit andassessment
  • • ReportPreparation
  • • Bidding documentation and Online BiddingAssistance

    Detailed Project Report

  • • Simulation Study
  • • Technology Selection
  • • Civil and Architectural
  • • Requirements
  • • Operation andMaintenance
  • • Risk Assessment
  • • Project Financials

    EPC Contractor selection & Contract Review (for large scale utility projects)

  • • Study and review of the Quotations
  • • Finalization of the Sub- contractor for civil, electrical and structural work considering the best quality andcommercial aspects
  • • Negotiations with the contractors on behalf of the client
  • • Contractreview

    Permits & Clearances

  • • Industrial Commissioner Approval
  • • SNAClearances
  • • MNREClearances
  • • Connectivity Approval
  • • CommissioningCertificates

    Detailed Design/Review and Vetting

  • • PlantLayout
  • • Civil andStructural
  • • Electrical (DC & ACSide)
  • • MonitoringSystems
  • • General Reports and Calculations

    Project Supervision and Monitoring

  • • Inspection of Equipment
  • • Supervision of construction work atsite
  • • Project Planning & Control
  • • Inspection andTesting

    Quality Assessment Service

  • • Technical Assessment of Suppliers
  • • On-site inspection of equipment
  • • Design review andvalidation

Lender’s Engineering

    Detailed Site Assessment

  • • Solarresource
  • • Topography/shading
  • • Site/soilcondition
  • • Security
  • • Environmentfactors

    Design Evaluation

  • • Technology selected
  • • Designcriteria
  • • System integration
  • • Safety Measures

    Performance Evaluation

  • • Minimum guaranteed generation with Performance Ratio (PR)
  • • System power ratingcheck
  • • First year energy production

    Schedule Evaluation

  • • Site leveling, boundary wall erection & foundationwork
  • • Structure erection and Module Mounting
  • • Designcompletion

    O & M Contract Review

  • • O & M costestimate
  • • O & M contract terms andconditions
  • • O & Mmanual
  • • Special tools and skilled manpower availability

    Performance Acceptance Test

  • • Proper functioning of the PV powerplant
  • • Monitoring system shall be checked regarding plausibility and accurate data monitoring
  • • Functioning of error detection and troubleshooting shall be investigated and tested
  • • Proper tests for insulation

    Construction Monitoring

  • • Onsite construction monitoring
  • • Review of supply and Servicecontract
  • • Project planning and schedule